Price a Job to Cover Your Costs
Start with the income and overhead your paid days must cover. Then allow for this job’s whole occupied time, parts and risks before deciding the customer’s price.
On this page

What does a paid day need to earn?
| Illustrative annual plan | Amount |
|---|---|
| Income target before personal tax | £36,000 |
| Annual business overhead | £12,000 |
| Needed before direct job costs | £48,000 |
| Realistic paid days | 180 |
| £48,000 ÷ 180 | About £267 per paid day |
These example figures illustrate a pricing plan, not a recommended rate. The income target is what the owner wants to fund; it is not a claim about a deductible accounting expense. Include time off, training, quoting, administration and unfilled days when choosing the number of paid days.
The overhead figure covers recurring costs such as insurance, vehicle standing costs, accounting and software. Direct materials and costs for a particular job come later. Count each cost once.
Worked example: turn a repair into a quotation
This example is a VAT-registered business quoting a standard-rated repair. Its cost figures exclude VAT it expects to recover. It rounds the planning day to £267 and assumes six recoverable hours: £44.50 per occupied hour.
That hourly amount funds the owner’s income target and recurring overhead. It is not just the time spent holding a tool.
| Time occupied by this job | Allowance |
|---|---|
| Outward and return travel | 45 minutes |
| Assessment, preparation and repair | 105 minutes |
| Testing, cleanup and handover | 30 minutes |
| Total occupied time | 3 hours |
| Price-building line | Calculation | Amount |
|---|---|---|
| Time, including income target and overhead | 3 hours × £44.50 | £133.50 |
| Parts and consumables | Cost for this example | £38.00 |
| Parking | Cost for this example | £4.00 |
| Disposal | Cost for this example | £6.00 |
| Subtotal | £133.50 + £38 + £4 + £6 | £181.50 |
| Defined uncertainty allowance | An allowance for this scope, not unlimited extras | £18.50 |
| Amount to recover before margin | £181.50 + £18.50 | £200.00 |
| Selling price before VAT | £200 ÷ (1 − 20%) | £250.00 |
The chosen 20% margin is £50 of the £250 selling price. Adding 20% to the £200 cost would produce £240, which leaves a different margin. The example’s £50 is above the allowances for costs, owner income and overhead, before business taxes; it is not a guaranteed outcome.
Show the customer the complete total
The standard VAT rate is 20%. For this standard-rated example, £250 plus £50 VAT gives a £300 customer total. GOV.UK’s charging guidance explains VAT-inclusive prices and the requirement to register before charging VAT. Different work can have a different VAT treatment.
A business that is not VAT registered does not add a VAT line. It needs to use the purchase costs it actually bears, including unrecoverable VAT, when building its own price. Do not copy the example’s net parts cost or assume that every repair should cost £300.
Where the estimate often goes wrong
- Travel: include both the actual journey and any return or merchant trip the scope requires.
- Parts: use the correct specification, delivery cost and unavoidable waste, rather than the cheapest similar-looking item.
- Booked time: allow for setup, testing, cleanup and handover as well as repair work.
- Uncertainty: identify the assumption. A small allowance does not cover any possible hidden defect.
- Marketing: include subscriptions or unsuccessful enquiry costs in the relevant overhead allowance; keep a fee specific to this job with its direct costs.
Compare subscription and paid-contact costs using actual spend and bookings. If a past similar repair occupied half a day, use that information instead of automatically selling the next one as an hour.
Price emergency attendance before the fault is known
When the repair is not yet identified, explain the initial attendance separately. State whether its price includes investigation, making safe or specified repair time. Explain how parts, further labour or another visit will be quoted.
Keep the approval with the job and use the booking checklist. The applicable consumer-contract information still matters; the short example message is not the whole contract.
Use the finished job to improve the next price
Put the estimate beside actual occupied time, parts, direct costs and the invoice. A repeated parts run or missed disposal charge gives you a specific correction. A single unusually quick job does not establish the time for every future visit.
The invoice guide turns the approved scope and price into a bill the customer can use.
Frequently asked questions
Updated 15 November 2026 · Report a factual error


